Shorten Lead Time
Efficient scheduling improves production capacity
- High efficiency collaboration among the stages of sale, material control, purchase and warehouse.
- Pre-estimates production capacity in order to achieve reasonable scheduling.
- Makes precise materials requirement planning for material preparation.
- Improves the efficiency of production scheduling adjustment to respond the frequent changes of marketing.
Control Progress to Ensure Delivery Date
- Freezes allocated product to avoid miss distribution.
- Prepare materials for product suite in advance to avoid supply break.
- Tracks and reports production progress, to quickly respond the accident in case of unexpected issue occurs
- Strictly controls material over-issue and over-consumption to avoid unnecessary waste
- Track and handle the reworking and rejection of the unqualified products to lower the wastes.
Production Management
- Exactly calculates production time, batch quantity, start and end time of each stage according to safety days, lead time, adjustment time, and buffering time, etc..
- Provides powerful MRP function, the MRP will automatically generate production proposal according to sales order, sales forecast, and production plan, etc.
- Provides net demand planning MRP, gross demand planning GRP, reorder point and some other MRP methods, and well controls materials requirement.
- The Chang Hang T9 Net Change MRP function allows automatically recalculating MRP for the changed document.
- Chang Hang T9 provides even log of MTO ID, and complete MTO production and distribution management.
- Specifies packaging method on sales order or delivery order instead of on BOM.
- Rough-cut capacity analysis: Analyzes production bottle neck and capacity.
- Capacity analysis: Analyzes actual capacity of work center, and reasonably allocates production resource.
- Freely checks production status through one-key query on flow chart, dispatch list, or output product receipt.
- Distinguishes customer-provided materials on MRP and automatically generate s material refill request.
- The MRP considers material substitution, in case the standard material is insufficient, system will consider the alternative materials and select the materials by ranking.
- The flexible work report management meets different level enterprise's requirement.
- The precisely WIP management strictly controls WIP shortage, and automatically calculates WIP quantity and transferable quantity. The management makes product cost calculation more exact.
- Chang hang T9 automatically generates WIP ID according to WIP work report. A product's production records can be easily known through the ID while issuing this product.